Upgrade from 4.1.x to 4.1.6

Applying product updates will give you an enhanced experience of working with Qualitia Automation Studio for Web and Mobile.

If you are using Qualitia Automation Studio for Web and Mobile v4.1.x, you need to upgrade it to the v4.1.6 before you upgrade to the latest version. 

Prerequisites

  • Qualitia WebDriver 4.1.x.

  • It is strongly recommended to backup up Qualitia server databases (Master, Project, and Result Databases).

  • If your MySQL database server is installed on Linux machine, you must ensure that the values of column ProjectName and ProjectDBName names are in the lowercase under Master Project database in the table tblprojects. Entering project names in uppercase may cause failing upgrade process.

  • Ensure port 8889 is open and accessible from the machine where you are installing Qualitia Server.

  • If the number of projects to be upgraded is more than 50, you must increase the max_connections limit from MySQL database configuration settings. For more information about increasing the limit, refer to Qualitia Troubleshooting section.

  • Ensure you close all the instances of Qualitia Automation Studio and Internet Explorer before you start the upgrade process.
     If Qualitia Automation Studio is open, the upgrade process closes all the active Qualitia instances. If you have multiple Qualitia instances open, ensure you save the changes and close all the Qualitia instances before you start the upgrade process.

Upgrade Qualitia Server