Document toolboxDocument toolbox

Using Save Task As

Instead of recreating a task, using Save As feature you can create a task from any existing task whose requirements are similar to the new task with a few changes. You can add steps to this task or remove selected steps without affecting the original task. You save time by creating a task using an existing task.

To create a task using the Save As feature:

  1. Click Develop > Tasks.
    The Tasks screen is displayed. The screen is divided into two main panes, left pane and right pane. On the left pane, all the existing tasks are organized in the tree structure.
  2. On the left pane, select the required Task.
  3. Click Save As.
  4. The Save Task As screen is displayed.
  5. Enter Task Name and Description.
  6. Enter File Name. This could be any name as per the naming conventions supported by the operating system.
  7. Click Save.
    The file is saved with .xml extension.
    The new task is created quickly using the existing task. You can now make changes to the newly created task according to your requirements.