Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Define Automation Host for machines where QEA is expected to execute Test Cases.
  2. Create a Test Case in Qualitia.
  3. Create a Test Set in QST. Update the field Qualitia Project with respective Project Name.
  4. Select the Automation Host on which Test Set has to be executed.
  5. Select Status as Not Started.
  6. Select the Type as Automated, to execute the Test Set through QEA.
  7. Create a Test Case in QST and update the field Qualitia TC Name to link Qualitia Test Case.
  8. Select Automation Engine as Qualitia.
    The Test Set can be scheduled to execute at a particular date/time.
  9. To schedule the Test Set execution, select the desired date using Calendar in the Planned DateĀ field.

    Info
    iconfalse
    • While the Test Set execution is in progress, you can see a Play icon against the Test Set.
    • After successful completion of the Test Set, a Check Mark icon is displayed against the Test Set.
    • In case the Test Set execution fails, a Red Cross icon is displayed against the Test Set.


  10. Post execution, refer to the Test Set in QST, and go to Test Run tab.
  11. Check the latest Test Run for the Test Case Report.
  12. Go to Console Output section of the Test Case.
  13. Copy the URL updated in the details section and open it in the browser to view report.

Info
iconfalse
  • To access reports saved on a server, report location should be shared with the machine where QEA is installed.
  • When QEA is launched, it does not update the Test Set list. You manually have to Force Poll to get the Test Set in the list or else wait for the next polling cycle.
  • If no Test Case is linked with respective Test Set, Test Set will not be updated in the QEA list.

...

Qualitia and QST statuses are not the same for any given scenario at all time. Below is a matrix that defines the relation between different statuses in Qualitia and QST.

Qualitia StatusQST Status
PassedPassed
FailedFailed
DefectFailed
Not ExecutedNot Run

If development xml does not exist/missing

Blocked
If Project is invalidBlocked
If development xml requires sync but is locked by other userBlocked
If TC does not exists in active projectBlocked

QEA-QST Connection Status

The tool status in terms of connection between Qualitia Execution Agent (QEA) and Qualitia SpiraTest during the execution of Test Suites/Test Cases is reflected as under:

When QEA makes a successful connection with QST at polling cycle.
Image Modified
When QEA is unable to connect to QST.

Image Modified

When QEA is paused.

Image Modified