Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Step 1: Launch the Project Migration Utility,.
From the first screen, click Next.

...

Step 2:

Enter the following details to connect to a the QFD database.

...

Field

...

Description

...

Database Type

...

Select the Server from the drop-down list: SQL Server and MySQL.

...

Server Port

...

Enter the Server and the Port IDs.
The default port is 3306 for MySQL and 1433 for SQL.

...

Authentication

...

Select the authentication type: Windows Authentication or SQL Server Authentication 
This field is applicable for SQL server only.

...

User Name

...

Enter the database server username

...

Password

...

Enter the database server password.

...

Database Name

...

Enter the database name which contains metadata of all the projects.

...

Qualitia Server URL

Enter the URL where Qualitia Server is installed. 

...

  • Type: Lets you select the database type, MySQL or SQL Server.

  • Server: Port: Lets you specify the database server address along with its Port Id. The default Port Id for MySQL is 3306 and for SQL Server is 1433.

  • Database Name: Lets you specify the Master Database name.

  • Authentication: Lets you authenticate the SQL Server using Windows credentials. 

  • User Name: Lets you specify the username to connect with the database.

  • Password: Lets you specify the password for authentication.

  • Version Tool: Select as SVN or None.

  • Project Path: Lets you specify the path where Qualitia saves the project artifacts (test cases and tasks).

...

Step 3: Under Project Selection, do the following:

  1. Select the QFD projects you want to migrate.

  2. Click Next.

...

Step 54: The Utility validates whether all the tasks and test cases in the project path are present.

...

Note

If you skip the missing files, the migrated projects will not have the missing test cases and tasks.

Step 65: The Project Health Check starts for each selected project.

...

Info

Verification for a project may fail due to the following reasons:

  • The number of Test cases in the Project Database and Project path are not equal.

  • Some test cases of the project are locked.

  • If the connection to DB is interrupted.

Step 76: The Verification of Project Artifacts shows verifications failed in test cases and tasks XML file for every project.

...

  1. Click Next to start the Project Migration process.

...

Step 8:

Click the Download Report to download the Project Health Check report. The report shows the status of verification for each test case and task along with their IDs and statuses. Also, the reason for a test case or task verification failure.

In the case of multiple projects:

  • You can migrate only those projects which were successfully verified.

  • If no project is verified successfully, a message is displayed, which shows that the migration process cannot proceed.

Step 9: Qualitia 8.0 Database details screen opens.

  1. Enter the following database details for the Qualitia Automation Studio to which you want to migrate.

    1. Type: Lets you select the database type, MySQL or SQL Server.

    2. Server: Port: Lets you specify the database server address along with its Port Id. The default Port Id for MySQL is 3306 and for SQL Server is 1433.

    3. Database Name: Lets you specify the Master Database name.

    4. Authentication: Lets you authenticate the SQL Server using Windows credentials. 

    5. User Name: Lets you specify the username to connect with the database.

    6. Password: Lets you specify the password for authentication.

    7. Project Path: Specify the folder where Qualitia project artifacts (test cases and tasks) are saved. 

    8. Take Database backup: Enables to take the backup of QFD projects.

Step 109: If you have taken the backup, then project backup starts.

After project backup completes, click Next.

Step 1110: The project migration starts. After project migration completes, click Next.

...

Step 1011: The Project Migration Summary opens.

For every project, if all test cases and tasks are migrated successfully, it shows as “All tasks are Migrated Successfully” and “ All test cases are migrated successfully”.

Click Finish to exit the project migration utility.

...